

Chapter 01 · Climate
Villa air conditioning.
A cool house in the middle of August, with no noise and no unit in sight.
A good systemgoes unnoticed.It gets measured.
Six services
What we install.
Equipment from major European brands, named in every quote.
Four steps
From survey to commissioning.
01
Survey
We measure every room: volume, exposure, existing installation.
02
Design
We calculate each room's needs and draw the installation to scale. You know where every duct runs before you sign.
03
Installation
Lines insulated along their whole length, brazed under nitrogen so no impurity enters the circuit.
04
Commissioning
We check the circuit is tight before charging it, then hand over and explain the readings.
The detail.


Before you decide
Your questions.
Which system suits my villa?
It depends on the number of rooms, the height of the false ceilings and how each room is used. Split suits independent rooms, ducted hides everything in the ceiling, VRF controls each room from a single system. We advise room by room, after the survey.
Can a ducted system be fitted in an existing villa?
Yes, if the false ceiling leaves enough room for the ducts, or can be lowered. We measure it during the first visit.
What does the commissioning report contain?
The result of the pressure test and the readings taken at commissioning, in writing. In five years, any technician can check that the installation has stayed as it was.
Which brands do you install?
Equipment from major European brands, chosen for your villa and named in the quote. We maintain and repair all brands, including installations fitted by others.
How long does an installation take?
It depends on the system and the size of the villa: a few days for split units, longer for a ducted or VRF system, which runs through the false ceilings. The schedule, with its completion date, comes with the written proposal.
Let's begin with a survey of your rooms.
Book a visit- [+971 XX XXX XXXX]
- Telephone
- [+971 XX XXX XXXX]





