

Chapter 02 · Solar
Rooftop solar.
Your roof produces part of your electricity; you follow it every day from your phone.
Every panel sizedto your consumption.Nothing more, nothing less.
Six services
What we take care of.
Equipment from major European brands, named in every quote.
Four steps
From roof to meter.
01
Study
We survey your roof and analyse your last twelve months of bills.
02
Proposal
In writing: the expected annual production, the cost of the installation and the commissioning date.
03
Approval & installation
The DEWA application first, with our accredited partner. Work begins once approval is granted.
04
Commissioning
Connection, meter check, and a report that stays in your file.
The detail.


Before you decide
Your questions.
How does net metering work in Dubai?
Under DEWA's Shams Dubai initiative, your rooftop system is connected to the grid through a two-way meter. The electricity you do not use is exported to the grid and credited to your account, against your following consumption. It is not bought back for cash, which is why we size the system on your actual consumption.
Do I need an approval?
Yes. A grid-connected installation requires DEWA approval and must be fitted by an accredited installer. We work with a DEWA-accredited partner, who prepares the application and follows the connection.
How large should my system be?
We size it from your last twelve months of DEWA bills and the usable roof area. The written study gives you the expected yearly production before you commit.
What maintenance does it need?
Dust settling on the panels reduces their output. We clean them four times a year and check the inverter and connections at each visit.
Show us your roof.
Book a visit- [+971 XX XXX XXXX]
- Telephone
- [+971 XX XXX XXXX]





