Skip to content
A renovated villa living space: open kitchen, oak cabinetry and a pale stone floor with aligned joints.

Chapter 03 · Interiors

Villa renovation.

A renovation run with the discipline of a European site: you know the completion date before day one, and the progress every week.

One contact.One written schedule.A clean site every evening.

Six services

What we renovate.

  1. A villa interior mid-renovation, walls stripped back and floor protected.

    01 / 06

    Full villa renovation

    From strip-out to handover, one team and one schedule.

  2. A bathroom wall freshly waterproofed, membrane taped at every corner.

    02 / 06

    Bathrooms

    Waterproofing is tested before the first tile. Joints run from floor to wall without a step.

  3. A minimalist kitchen with flush handleless cabinets and a stone worktop.

    03 / 06

    Kitchens

    Plumbing, electrics and fitting coordinated in a single plan, so each trade arrives at the right moment.

  4. Made-to-measure oak wardrobe doors, one panel open on its hinge.

    04 / 06

    Joinery

    Wardrobes, doors and panelling made to measure and fitted on site, to the millimetre.

  5. Large-format stone tiles laid on a levelled base, spacers still in place.

    05 / 06

    Flooring

    Stone, porcelain or timber, laid on a perfectly level base.

  6. Electrical conduits and water pipes in an open wall before closing.

    06 / 06

    Technical works

    Electrics, plumbing and air conditioning by the same team: no coordination on your side.

Equipment from major European brands, named in every quote.

Four steps

From walkthrough to handover.

  1. 01

    Walkthrough

    We measure every room and note each of your wishes.

  2. 02

    Written proposal

    A quote with every item priced, and a week-by-week schedule with the completion date.

  3. 03

    Works

    Your home protected, a progress update every week, a site left clean every evening.

  4. 04

    Handover

    We walk through the snag list together. Everything is cleared before the final invoice.

The detail.

Grey protective sheeting on a marble floor, with a single tool case placed square.
ProtectionFurniture and floors covered, dust contained.
Close-up of pale stone tiles meeting floor and wall, joints perfectly aligned.
JointsJoints that run from floor to wall without a step.

Before you decide

Your questions.

Who coordinates the different trades?

We do. Electrical, plumbing and air conditioning are carried out by the same team, with one point of contact and one schedule.

How am I kept informed of progress?

Through a progress update every week, compared with the schedule handed over with the quote. If a date moves, you know before, not after.

Can we live in the house during the works?

It depends on the scope of the works: often yes for a single room, rarely for a whole villa. We decide it with you during the first visit. In every case, furniture and floors are protected, dust is contained, and the site is left clean every evening.

Is the quote itemised?

Yes. Every item is listed, and the quote comes with a week-by-week schedule.

How does handover work?

We walk through the snag list together. Everything is resolved before the final invoice.

Let's walk through your home.

Book a visit
WhatsApp
[+971 XX XXX XXXX]
Telephone
[+971 XX XXX XXXX]